This blog follows the construction and design development of two townhouses on Boerum Place, by Bouratoglou Architect, PC.
08 September 2009
shoring up the sidewalk
Today the steel was errected to shore the sidewalk. Since our building does not have a front yard or setback, the foundation contractor needed to keep the sidewalk in its place, while we get ready to dig further and work on the foundations. The steel was placed 25'-35' deep.