Today we are continuing securing the sidewalk, so we can work on the foundation.
This image shows the sidewalk in front of our site.
This image show the work happening behind the blue fence. The excavator is removing dirt so that the lagging can be installed.
The steel was anchored into the earth yesterday and today the lagging (wood) is placed between the vertical steel members, and then backfilled with the dirt.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.