It is coming to the point where the "construction site" is being transformed into a "home". I would only say "home" as 103 Boerum is much further along than 101 Boerum. Walls and ceilings are painted (partially), interior doors are hung, moulding around doors and windows are ongoing, and floors (both tiles for the bathrooms, and wood for the majority of the house) are underway. The guys who are working on the drywall started at 103, and worked their way down and then to 101. The images are from 103. The drywall is all hung in 101, but they are taping and plastering, still very much a dusty construction site.
30 March 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.