12 November 2010

What a week!

Plumbers ran the tubing for the radiant floor heating.The framers followed framing the 3rd and 4th floors of 103 Boerum Place. I had marked all the walls and door openings with blue masking tape ahead of time, so that they had lines to follow.This is the bathroom door and walk-in closet door standinge in the Master Bedroom. I had also marked all the electrical outlets so that John & I could attach the boxes. The electricians will come once all the walls are framed.
The plumbers also attached all the rough-ins for the wall mounted toilets on the 3rd and 4th floors.
While all this was happening inside, the sun was shining and the masons were continuing the cement fiber board. The scaffolding is down and only the sidewalk shed is left. I will post an image of that this weekend.










No comments:

Post a Comment

Note: Only a member of this blog may post a comment.