While all this was happening inside, the sun was shining and the masons were continuing the cement fiber board. The scaffolding is down and only the sidewalk shed is left. I will post an image of that this weekend.
12 November 2010
What a week!
Plumbers ran the tubing for the radiant floor heating.
The framers followed framing the 3rd and 4th floors of 103 Boerum Place. I had marked all the walls and door openings with blue masking tape ahead of time, so that they had lines to follow.
This is the bathroom door and walk-in closet door standinge in the Master Bedroom. I had also marked all the electrical outlets so that John & I could attach the boxes. The electricians will come once all the walls are framed. ![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEik141F22PlSI5UKFGUK_c1weXa6rwgaCKHWVn69i80ZwXuu5Dvmh7BoXubmDv459FmNKay7wIjHQCXETCscRClqhUSXcYTFkhC9eozOtPc6Zu2PA7rD_bGS8VOvoLPhMMalc8hCSNTJkN0/s320/4th+floor+framing.JPG)
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEibIr_VACXDbEKI4NyIB6w5p35lfvx9PdO85lQx7sKFEKDoSjwwSwsKS_67E9HPVvAV__k7cWCP8QXIbwGp3TPK_jBLTiv04bXemXR0bLsyLbpOnVFZb6qskKVHWJ1XRinWfzMpeNvnc-SV/s320/framing+4th.JPG)
The plumbers also attached all the rough-ins for the wall mounted toilets on the 3rd and 4th floors.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.