a floor.
In just a few hours, two W10 x 38 members (Above image of 103 BP) were placed above two 10' - 6" rear yard openings while...
two (One for each front building facade) galvanized 4"x 3-1/2" x 3/8" angles were bolted to two 8" x 6" x 7/16" angles. These lintels will support an 18" high horizontal band of brick.
Tomorrow's another day, anticipating a large load of joists to form the second floor