01 September 2009

Kyrie Eleison


We are thankful for Father John, of The Cathedral of St. Constantine and Helen, for stopping by this morning to bless our site(s). It is common in the Greek Orthodox tradition/ faith to bless a site prior/ during development, as is the blessing of a home.
After clearing my throat, I served as the cantor (Although Father John may not agree), during this ceremony, and lead the choir.

31 August 2009

The Dig










Today the excavator arrived on the site!! The excavation crew did some probing to see what was below the dirt - as there were two buildings here until the 1950's. They found remnants of the existing foundation up against 105 Boerum Place (the enlarged picture). They will be back tomorrow to remove this foundation by hand.

24 August 2009

Kitchen Ideas






Working on the kitchen layout and elevations. Here is the layout and elevations of the two walls. The base cabinets, upper cabinets and island I am looking at painted gray cabinets. I would like to use a wood, perhaps a carbonized bamboo for the tall pantry cabinets and wall oven cabinet. The countertop will be We are also exploring using a gray stain on the hardwood floors. (double click to enlarge image)

Below are images of the wood-plyboo strand, marble and gray for the cabinets.


23 August 2009

101 + 103 Elevations























Here are both 101 + 103 Boerum Place side by side. From this image you can see that these two buildings are mirrored.

Rendered Front Elevation


This is drawing of the front elevation. The materials being used are red brick, gray cement board and steel windows.





Rendered Section



This is a section through 103 Boerum Place. It is a slice through the building - so that you can see how the spaces are stacked one upon another. This section shows the opening between the Living Room and the Dining Room and the connection to the rear yard.


Rendered Drawings


Here are the floor plans for 103 Boerum Place.